Call Us Now On 01865 321554. Open 09:00 - 17:00, Monday to Saturday. Closed on Bank Holidays. showroom@manorflooring.co.uk

Acquiring any type of flooring is definitely expensive. As a result, you might want to have the ability to put in the floor yourself. This may save you a lot of money, and the experience can be an extra ability for yourself. Here’s a step by step guide teaching you how to install flooring on bare concrete.

1. Thoroughly clean the concrete subfloor

Using an impeccably clean concrete subflooring is a crucial component of installing your very own floor. This will make certain any type of flooring you’re going to install will look remarkable. Clean the spot profusely and ensure not a single thing is left behind. At the conclusion of the cleaning session, include a humidity barrier so excess humidity doesn’t seep in from the bottom to your top flooring layer. Do not forget and skip this step because it’s necessary to get that moisture barrier if you’d like to protect hardwood floors like bamboo hardwood or engineered wood. Should there be far too much humidity it may split the floors in the future.

2. Place down the boards

Start laying the floorboards down from the longest side of your wall. Use adhesive that is top of the line if you want a perfect installation. Try to not apply an excessive amount, just put a sufficient quantity of adhesive on your floorboard and lay it down. Go on to execute this along the entire wall. Make every effort to press the floorboards firmly in place knowing that there are no spaces in between.

3. Keep the floor boards from slipping while drying

Being the adhesive demands a long period of time to dry, you need to be sure the boards are in place to make sure that gaps do not happen. It’ll be difficult to correct gaps once the adhesive has completely dried. Use something like blue painter’s tape to hold the floorboards in their place while drying. If any of the adhesive presses out from the cracks, wipe it away while it’s wet mainly because it will likely be harder to do once dry.

4. Arranging the planks

Continuously apply the planks on the concrete floor. Be sure that you pick your floor pieces carefully during the time you have them installed. As an illustration, to make sure you possess a uniform floor, you’ll want to use planks belonging to the same box, and examine each floor board to determine if the hue of your planks are all equivalent. Just do not forget that the floor planks may vary when it comes to their shade.

5. Take away the Painter’s tape

Before taking off the painter’s tape, make sure that the adhesive is utterly dry. Patience is virtue because you do not want to rush the drying process. Leave the installation like that overnight or for as long as possible, and don’t allow any foot traffic in the area. It will help your floors dry the way you intended it. If at least 12 hours have passed, then go ahead and take away the tape one at a time. Move in some furniture, and there you have it! A nice, cozy, beautiful looking home.

Anita is a major contributor for Floor and Decor Outlets, a leading flooring retailer that offers some of the best prices on the market for flooring materials like hardwood, bamboo style flooring, glass tiles, slate tiles, and many more.

View the original article here